• About
    • Our Team
    • Location
    • Industry Case Studies
    • Mission & Values
    • Corporate Responsibility
    • Vendor Management
    • History
    • Contact
  • Industries
    • Agribusiness
    • Food & Beverage
    • Metals & Steel
    • Mining, Aggregate, & Concrete
    • Oil & Gas
    • Paper
    • Power Generation & Energy
    • Water & Wastewater
    • Wind Services
  • Products
    • Type
    • Manufacturers
    • Asset Management Program
  • Generators
  • Remanufacture
    • Electrical Repairs
    • Mechanical Repairs
    • Machining
  • Field Services
    • All Services
    • Installation and Commissioning
    • Overhead Crane & Hoist Services
    • Wireless Equipment Condition Monitoring IoT
    • Predictive & Preventative
      • Vibration Analysis
      • On-Site Electrical Testing
      • Large AC and DC Motor PM and Repair
      • Gear Reducers
      • Precision Laser Alignment
  • Asset Management
    • Asset Management Program
    • Transport & Logistics
  • Careers
  • Login

Decatur Industrial Electric

Contact Us

Service & Quotes: 217-428-6621

You are here: Home / TCO - Case Study / Decatur Industrial Electric Repairs & Modifies Gear Reducer for Plastics Company 75% Faster than OEM

Decatur Industrial Electric Repairs & Modifies Gear Reducer for Plastics Company 75% Faster than OEM

A plastics company contacted Decatur Industrial Electric for our expertise in repairing a failing gearbox which also needed modified in order to fit an application. The OEM had estimated 8 weeks for the repair turn-around time and the customer needed it sooner.

The gearbox was suffering from bearing failure, seal damage, gear wear, and other costly issues.

Seal Damage

 

 

 

 

Decatur Industrial was awarded the repair and completely rebuilt and modified the gearbox, with the goal of extending its life. Some of what we did included:

1.       Relocation of the mounting holes

2.       Rerunning of the oil feed lines

3.       Removal of oil troughs in order to go from fling oil system to a force feed oil system

4.       Installation of new piping for oil scrubber

5.       Rebuild of oil cooler and oil cooler pump

Our full-service machine shop also modified it from a vertical position to a horizontal position, as seen in the final “after” picture below. This customer was saved approximately 6 weeks of additional repair time. Plus, since they didn’t have to get on an airplane to go down to the OEM, the customer was able to visit their equipment and follow the progress more closely, which was important to them.

gearbox

Filed Under: TCO - Case Study

Archives

  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • November 2024
  • August 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • January 2024
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • June 2023
  • May 2023
  • April 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • January 2016
  • December 2014
  • November 2014

Copyright © 2025 Decatur Industrial Electric - 217-428-6621